Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 4841-4850 of 5683 (Search time: 0.003 seconds).
Item hits:
Issue DateTitleAuthor(s)
2023-07STUDY ON STABILIZERS FOR GRANULAR LAYERS OF FLEXIBLE PAVEMENTS A REVIEWNitish Garg; Ajay K. Duggal
2023-11EXPERIMENTATION ANALYSIS ON ENERGY SAVING IN AIR CONDITIONING SYSTEM BY MEANS OF VAPOUR COMPRESSION SYSTEM WITH HEAT PIPE HEAT EXCHANGERS (HPHX)B. Laxman; Mohd Mohinoddin; Narsimhulu Sanke
2023-02-28ANALYSES OF VIRTUAL MIMO MULTI-USER SYSTEM PERFORMANCE WITH LINEAR PRECODING SCHEMES USING INDOOR MEASUREMENTS AT 5 GHZBalla Moussa, Coulibaly
2023-09HOW TO PROTECT THE PRECAST GIRDERS FROM FALLING FROM THE PIERABUTMENT CAPS AFTER ERECTION AND BEFORE CASTING OF DECK SLABCROSS GIRDERSKNSP Kamaraju
2023-01-23CONTRIBUTING FACTORS TO MARKETING EDUCATORS’ TEACHING PERFORMANCE: INSIGHTS FROM EXECUTIVE POSTGRADUATE PROGRAMMES IN BRAZILSalvador, Alexandre Borba; Bassi-Suter, Mariana; Forsdike, Nicola
2023-09-28DEVELOPING INTERNAL MARKETING STRATEGIES FOR MEASURING AND MANAGING EMPLOYEE-BASED BRAND EQUITYBaca, Granit; Reshidi, Nail
2023-11ANALYSIS OF INFLUENCING FACTORS IN THE HANDLING OF REGENCY ROAD SEGMENTS IN TAPIN REGENCYIlham Nur Ahzan; Iphan Fitrian Radam
2024-01SMART CITIES AND CIVIL ENGINEERING INTEGRATING TECHNOLOGY FOR URBAN DEVELOPMENTIshatul Islam; Vishakha; Ajay Vikram
2023-10-17CRITICAL EXAMINATION OF ACADEMIC MARKETING AND SERVICE RESEARCH’S PHILOSOPHICAL FOUNDATIONTronvoll, Bård; Edvardsson, Bo
2023-11CONTROLLING OF TIME AND COST IMPLEMENTATION BY USING EARNED VALUE ANALYSIS (CASE STUDY SHRIMP CULTIVATION DEVELOPMENT PROJECT WITH AREA-BASED IN KEBUMEN REGENCY)Muh. Nur Sahid; Agus Riyanto; Abdul Rochman; Mohd Adib Mohammad Razi; Adila Chilmayanti